NIEDZICA  -  Hydro-Electric Power Plant

 

Niedzica is a pumping plant and reservoir - i.e. the power plant which releases electric energy to the grid in the highest demand hours. The pumping capacity is used in night hours when energy is cheap and abundant. Water is pumped from the lower reservoir to the upper one - to be used next day in propelling the turbines. Such power plants have a very short start-up time. In our case it is 3 -4 minutes.

 

 

The power of turbine sets at active turbine operation, and 42-48 m head. Power received from the grid in pumping operation and the rise of 40.6 m.

2 x 46,375 MW

2 x 44,5 MW

Synchronic rotation speed Generated voltage 166,7 r.p.m
15,75 kV

Phot.1 - the founding of the turbo set stator

 

Phot.2 - the inside of rotor (4.3 m dimension)

 

Phot.3 - the mounting of turbine , in 1994 r.

 